Applicant: Georgina Madsen Presenters: Georgina Madsen & Damian Hall Topic: MCU22/0094 - Noosa Business Centre Sanctuary Childcare
See the votes on this matter →
What was decided?
The minuted decision sequence
No separately labelled carried Council Resolution has been identified here. Read each formal event and the complete item minutes; a lost motion is not necessarily the final outcome.
Read complete item-specific minutes
This summary follows this item’s minutes. The established voting totals use their existing method while differences are checked against the full records.
What was said?
Named discussion on NoosaWatch TV
These actual transcript passages match the item’s wording. The start and end of the item’s discussion are not yet confirmed; these excerpts are not measured item airtime or exact decision moments.
Georgina Madsen1:40
Yes, thank you. Thank you very much for having me along today. Apologies, I did plan to be here last week but circumstances led to that not appearing. So, Stockwell has a long history with the Noosa of Disney. Business centre, working with Council to develop master plan 2 back in the early 2000s approval for Noosa Civic, including that business precinct and showroom in 2003. And really that was all about the first stage for the business centre to deliver on the long health aspiration. Held aspiration or counselling community which was to broaden the economic base of Noosa. At that time, back in 2003 when we did the first stage, we dedicated over 10 hectares of land as Council-owned open space and provided extensive covenants along what is Eenie Creek Road, which existed back then, and the now Walter Hay Drive, which was delivered as part of Main Roads and Stockwell and Council funding back in that first stage opening in 2006. All of that was captured in an infrastructure agreement which was executed in 2003 so today I just wanted to talk to you about the Childcare centre that we've proposed on lot 4 which has a staff recommendation for refusal and I understand having read the report and the discussions with the Council officers obviously we're disappointed that where we are but we are where we are and we have worked actually very hard to ensure that the proposal delivers on the outcomes sought by the Noosa Council being Noosa style, architecture of Noosa style in a park-like setting the proposal is for 96 class place childcare and we have an operator unfortunately Damien Horne from sanctuary childcare couldn't be here with us the childcare intended is to provide places much-needed places for the Noosa community but specifically the nexus is with the business centre so to be able to provide child care for people working and living in that broader Noosa Business Centre providing them a child care in the village mixed use and I know that was a topic discussed previously in the county environment meeting. For me the child care proposal that we've proposed for lot four delivers it really as a Noosa style built form standalone within a bushland setting and a parkway setting along Hofmann Drive. To deliver something in the village mixed precinct to my mind would be at the upper level and so you're talking about a very different facility that's not to say it can't be done but it's certainly something that would be delivered in a city environment as opposed to a Noosa environment. We notified the proposal and we didn't receive any submissions against it or indeed for there was thank you. One that came outside the public notification period so our proposal seeks to deliver as I mentioned that childcare in accordance with that park-like setting so what we've done is we have the Noosa Plan requires a four metre minimum built form setback from Hofmann Drive. That's a new planning scheme. We've provided a 10 metre built form setback and we've landscaped heavily the first four metres of that in the proposal and you can see that in the application and in the renders that were provided as part of the application. The Hofmann Drive landscape garden beds that were required as part of the subdivision approval, they're what's on the ground now. They are predominantly small shrubs with a few larger, you know, ground cover with some selected saplings and that's compliance with the conditions of the subdivision approval. The landscaping proposed as part of the childcare is very different and really we've, as I said, we've worked very hard to deliver Noosa park-like the setting whilst being able to maintain land for employment generating uses, which is what the business centre is about. Having been a part of the subdivision approval, the reason that the 10 metres was provided with land spec garden beds along Hofmann Drive is because that land in there required bulk earthworks to deliver the required topography of the road and the stormwater drainage on the site. And so understandably and supported by us, we wanted an outcome that didn't leave the site exposed until those lots were developed. Mentioned, the childcare proposal, we've got a 10 metre setback to the built form versus the four metres required under the plan, and we've got a four metre deep planted garden bed along the majority of the site. We do have a detention basin at the front and we've included or incorporated into that and really made it a feature in the landscape with a seat to provide against. You know, accidental encroachment and then a pedestrian board walk over to connect from the pathway at the eastern spine of the open space covenant across to the child care. We've redesigned the proposal. It was mentioned at the planning environment meeting. We've got a subdivision, an ROL, a reconfiguration of lot to realign that proposed boundary by two metres. We already did two metres back before we lodged the application, so we did that, well actually, after we lodged the application, but we did that before the plans were sealed for the subdivision because we knew we needed a bit more space. The other thing that I referenced is the infrastructure agreement back in 2003 and what that required was essentially for Stockwell to deliver the upfront with the first stage of development, the road and open space infrastructure for the ultimate development. There's a clause 10 in that infrastructure agreement that provides immunity for future stages in respect of those elements and that was really and the clause actually captures that the intent was to provide both Council and the landowner that certainty about what the outcome would be given so much of it was done upfront. Clause 10 is the clause under the infrastructure agreement it says the Noosa Business Centre shall be developed in accordance with master plan 2 in stages consistent with the needs of the community. Clause 10.1 talks about what that stage 1 comprises and the future stages. The development application relates to stage 1 of the Noosa Business Centre being a retail centre with 18,300 square metres of total use area, showroom homemaker of 7,000 total use area and commercial business component of not more than 5,000 total use area. Future stages of the business, the Noosa Business Centre on the land as contemplated by master plan 2. And future stages of the Noosa Business Centre on land other than the land as contemplated by master plan 2. And that was just referencing the fact that they were two different landowners at that point in time that owned the parcels that comprised the business centre. Clause 10.2 says in temporary stage 1 and future stages, this agreement is intended to give the applicant certainty as to the contributions and/or infrastructure charges that will be payable by it or its successor. Entitled in respect of stage 1 and future stages of the Noosa Business Centre on the land and also to give the Council the correlative certainty as to the contribution to the community that will be made by the applicant. It goes on in 10.3 to talk about the extent of immunity of future stages to the Noosa Business Centre on the land from future infrastructure and conditions and charges that and basically provides for in fact I'm going to read it out I've got time. Subject to clause 10.3b provided that the intensity of development of a future stage does not exceed master plan 2 and subject to the provisions of the clause is 6.2.3 which is about road demand and external road network and 10.4 which is about water and sewer. The Council agrees that having regard to the contributions in physical infrastructure provided for in this agreement and the conditions of approval in respect of roads, cycleways, parks, open space, nature public recreational facilities, land, and cycle pedestrian parkways, bushland preservation, urban drainage, water quality or waterway management, the applicant and its successors entitled shall not be required in respect of future stages of the Noosa Business Centre. On the land to undertake work, pay contributions way of conditions imposed on any application on account of infrastructure charges levied in accordance with the act for works external to the land relating to all of those things. If it was council's intent a to provide a metre buffer to Hofmann Drive, that would have been captured in the infrastructure agreement. The intent was to provide a 10-metre buffer to Eenie Creek Road and Walter Hay Drive. The intent was to provide development within a park-like setting. Believe and remain committed to the fact that our proposal does that. We've made accommodations. We've worked with the Council officers to do that. Yes, we acknowledge the bio-retention. We've turned that into a feature. We've redesigned the centre. We've put we've in a reconfiguration of lot. And I ask you, what is the 10 metres going to give the Noosa community? That four metres of a landscape, lush landscape setback and 10 metres of built form setback doesn't achieve. Thank you.